Sewer Infrastructure
Work Place | : | Istanbul/Turkey |
Employer | : | General Directorate of Istanbul Water and Sewerage Administration |
Ending Date | : | 14.11.2007 |
Starting Date | : | 13.01.2010 |
Consists of up to Ø700 diameter canal renovations, including Ø700 diameter and repair (with braced excavation, horizontal drilling without excavation or blasting techniques), network pipe manufacturing, pipe coating, canal imaging and rehabilitation. At the beginning of the rehabilitation work, the waste water and rain water lines are cleaned and the images of these lines are taken. Problems in these images are detected. If there is loss of roughness, local cracks and melting in these lines, the problems are solved by coating the Phoenix pressure pipes with a resin-impregnated sheath (coating) hardened against heat reversed by air.