Bridge Underpass Viaduct and Road Works

Bridge Underpass Viaduct and Road Works

Bridge Underpass Viaduct and Road Works
Work Place: Istanbul/Turkey
Employer: Istanbul Metropolitan Municipality
Ending Date:16.01.2003
Starting Date: 01.06.2006

Underpass with one way double lane with 400 m closed, 200 m open section. Automation: Consists of ventilation of the system with 14 jet fans; fire extinguishing (foam extinguishing system) and lighting armatures as a whole and separately, operated manually or automatically; 2800 m total side road, 16000 m² environmental planning and landscaping; building of 9000 m Ø300-Ø2000 diameter concrete pipe with waste water and rain water; 2600 m Ø700 - Ø800 diameters of steel pipe and distribution line; 2000 m drinking water line.