Iski GAZIOSMANPAŞA
Work Place | : | İski GAZİOSMANPAŞA |
Employer | : | İski General Directorate |
Ending Date | : | 31.05.2011 |
Starting Date | : | 28.05.2014 |
Year 2010 Partial Renovation and Rehabilitation in Broken, Crushed, Damaged and Out of Service Waste Water and Drinking Water Lines Within the Area of Responsibility of İSKİ Gaziosmanpaşa Branch Directorate
Renovation and repair of wastewater lines; 36.300m wastewater network renovation with open excavation; Trenchless Construction technique (with coating, blasting and routing methods) 8.000m, 23.750 Clogged Connection Opening, 8.083 Clogged Canal Opening; 200.000m Main Canal Cleaning and imaging; Renovation and repair of drinking water lines; 10.400m drinking water line renovation with Open Excavation; Trenchless construction technique (with blasting and routing methods) 250m and 85.000m Branch Road Repair works are carried out.