Sewer Infrastructure
Work Place | : | Istanbul/Turkey |
Employer | : | General Directorate of Istanbul Water and Sewerage Administration |
Ending Date | : | 05.07.2006 |
Starting Date | : | 01.02.2008 |
70.000 meter waste water line production in miscellaneous diameter (0300-01800) and 50.000 meter (0300-02000) waste water and rainwater channel production using open excavation (with sheet piled and braced) and trenchless piping (horizontal drilling and blasting) techniques with concrete, reinforced concrete, HDPE and CTP pipes.